Skip to content
Independent electronic component distributionChina supply. International business.[email protected]

ADUM1201ARZ-RL7

Source the isolator your released board expects. Keep the channel directions, A-grade timing and reel option together when requesting a lot.

Channels
One in each direction
A-grade data rate
Up to 1 Mbps
Package
8-lead SOIC_N
ADUM1201ARZ-RL7 · supplied shipment photograph.

1201, A grade and RL7 each matter.

The family includes several direction and speed options. Compare the complete ordering code with the released schematic and assembly requirement.

FieldThis requirementPurchasing check
ADUM1201Two isolation channels, 1/1 directionalityADUM1200 has a different channel arrangement. A similar name or the same channel count does not establish interchangeability.
A grade / RZ1 Mbps maximum data rate; narrow-body 8-lead SOIC, −40°C to +105°CDo not apply the series’ 25 Mbps headline to this A-grade device. Keep the approved timing and footprint.
-RL7Factory reel option, 1,000; base ARZ is listed in tubes of 98Confirm reel or accepted split quantity. Preserve the suffix where the assembly process requires it.

Manufacturer references checked 23 October 2026. Factory packing quantities describe ordering formats; they are not a live ICstoq inventory balance.

Avoid changing the isolation boundary mid-build.

An industrial communication assembly can be complete except for its isolator. Buying the approved ADUM1201ARZ-RL7 keeps that shortage from becoming a review of signal direction, timing and board layout.

ICstoq supplies through our own inventory and established China supply relationships. Send the quantity, required arrival date and destination; we confirm the offered lot and delivery terms in your quotation.

Discuss this requirement

Send the signal directions

Identify the signal crossing each way and the supply on each side. The receiving test should follow the actual communication path.

Separate speed from packing

A, B and C grades are electrical choices; RL7 describes the reel option. Decide both rather than accepting whichever shortened code appears in an offer.

Keep insulation work explicit

State the documentation or measurement your acceptance process requires. Signal activity alone does not establish an equipment-level isolation approval.

Shipment details you can inspect.

The supplied carrier-tape and protective-packaging images connect the 1201ARZ top marking with an ADUM1201ARZ-RL7 laboratory shipment record.

Read the markings before you confirm the lot.

Laboratory submission label

Analog Devices
ADUM1201ARZ-RL7

Select a marker on the image or a number below. Each field answers a different purchasing question.

ADUM1201ARZ-RL7 · Laboratory submission label · supplied photograph
Select a numbered field to read it.
Laboratory submission label · ADUM1201ARZ-RL7. Supplied photograph.
FIELD 01 / 04

Submitted part

ADUM1201ARZ-RL7

The P/N on this laboratory submission record identifies the material sent for review. Reconcile it with the original manufacturer label and the issued report.

For your orderRequest the manufacturer ordering code and report identity.

Keep the 1201 direction configuration, A speed grade and RL7 carrier form in the requirement. Insulation testing needs its own agreed limits.

Discuss this requirement ↗

Explore more label examples ↗

Check the signals.
Define insulation work separately.

Set the inspection around the requirement that matters to your controller or interface board, rather than asking for an undefined “full test.”

SOIC leads, body and identification

Request clear top and bottom views, lead alignment and condition, package dimensions and marking observations. Agree how damaged or inconsistent samples will be reported and reviewed.

Review inspection methods

Direction, supply and timing

Name the two supply voltages, input patterns, data rate, output loading and timing limits for a functional check. If insulation-related measurements are needed, agree the method, voltage, duration, sample disposition and approval before testing. Do not substitute a generic high-voltage stress step for an agreed procedure.

Agree sample selection, equipment, limits, reporting and sample disposition. Specialised testing depends on laboratory capability and the accepted quotation.

Is ADUM1200 an acceptable replacement?

It requires an engineering review. The direction of the channels must match the schematic; a dual-channel description alone is insufficient.

Does “up to 25 Mbps” apply to ARZ-RL7?

No. The ordering table lists the A-grade option at 1 Mbps. Higher family speed grades should be evaluated as separate engineering choices.

Can we request inspection without high-voltage testing?

Yes. Describe the identity, condition or signal behaviour you need checked. Additional insulation work is a separate scope to review and agree.

See what the report records.

Use the photographs, observations and measurements together. The report should identify the sampled part and lot, the agreed methods and any exceptions.

For your order, request the report for the actual sampled lot. The acceptance scope is agreed before testing.

Read the report guide

Keep industrial communication builds on schedule.

Exact-part spot procurement can support an existing board when the rest of its BOM is ready for assembly.

Industrial controllers and isolated interfaces

Keep the approved direction and timing of the control and return signals. Tell us whether the material goes to your own factory or an EMS receiving team.

Instrument and data-interface assemblies

Agree the signal patterns and loads used for sample acceptance. Preserve the existing package and isolation layout rather than treating any two-channel isolator as equivalent.

Keep your two signal directions
in the enquiry.

Start with your part number and quantity. Tell us which details are already fixed and which still need review.

Send your ADUM1201 enquiry

Useful details for this part

  • Order and packingADUM1201ARZ-RL7, quantity, required date and split-reel policy.
  • Signal conditionsDirection of each channel, supply on each side, data rate and loading.
  • InspectionVisual or signal checks needed; any insulation procedure to review separately.
Image detailFit to view