Skip to content
Independent electronic component distributionChina supply. International business.[email protected]

FT232RNL
& FT232RNQ

USB-to-UART purchasing starts with the approved package. Confirm the L or Q option, retain RN in the code and agree packing before reviewing a proposed lot.

FT232RNQ · supplied external visual inspection image; this view represents the Q package.

Set the requirement before reviewing a lot.

ICstoq is an independent distributor supplying through our inventory and established supply relationships. Send the exact order code and required quantity; the quotation confirms the available lot and agreed conditions.

Send this part for review

Keep RN in the ordering code

Resolve FT232RNL versus FT232RNQ first. Do not shorten the requirement to FT232R or assume an older FT232R device is an approved replacement.

Resolve package before packing

L and Q are different footprints. Reel, tray or tube is a separate purchasing decision; preserve the complete manufacturer ordering form.

Retain your production configuration

Identify the approved host driver and UART configuration. Agree whether any non-default device configuration or programming is required before testing.

One UART requirement.
Two different footprints.

VariantPackageBefore ordering
FT232RNLSSOP-28Confirm the L footprint and the required tube or reel packing.
FT232RNQQFN-32Confirm the Q footprint and the required tray or reel packing.

Reel, tray or tube packing affects receiving and assembly handling. Changing from L to Q changes the footprint and requires approval against the released board design.

Inspect the actual device views.

These FT232RNQ views come from the supplied external visual inspection material. Use them to discuss marking, terminal and package checks for your proposed lot.

Agree inspection around your board.

Start with identity and condition: full ordering code, outer labels, package, top marking, terminals and packing. Ask for photographs and findings tied to the proposed lot.

For functional work, agree the host setup, driver, configuration, test fixture, interface operations, sample count and pass criteria. Any programming or destructive work needs approval before it begins.

Read labels and packing codes

Visual inspection

Specify package identity, leg or pad condition, top-mark observations and dimensional checks appropriate to the package. These checks do not establish the whole software interface.

Functional acceptance

Define enumeration, channel use, configuration and data-transfer requirements. Your approved board and host setup are the reference for an application test.

Report and release

Agree what must appear in the report, who reviews exceptions and what happens to tested samples. Release follows the accepted lot and the agreed scope.

Read the findings, not just the sticker.

These report excerpts illustrate how observations are recorded. Request the report identifying the actual part, sampled lot and agreed tests for your order.

How to read an inspection report

Where this purchase fits.

These are procurement contexts for designs that already specify the device. They are not substitution approvals.

Serial service ports and control panels

For an approved USB-to-UART design, retain the chosen SSOP or QFN footprint, UART signal configuration and production driver. A shortage purchase should preserve the field-service software already in use.

Serial adapters and embedded instruments

Confirm the required device descriptors, serial-number policy and configuration. Agree who supplies the approved configuration and whether any inspection may change it.

EMS builds awaiting one BOM line

Send the complete RN ordering form and package rather than a shortened FT232R reference. Agree carrier format and split-lot acceptance with the assembly team before allocating material.

Before you send the RFQ.

Can a similarly named FTDI device replace this one?

Confirm the full part number against the released BOM. Package, channel count, interface mode and software configuration must be checked by your engineering team before any substitute is accepted.

Can I buy a split quantity?

Tell us the minimum useful quantity, accepted date codes and whether split packing is allowed. We confirm the available pack, lot identification and handling conditions in the quotation.

What if the test scope is not settled yet?

Explain the concern and provide the acceptance specification you have. We can discuss the laboratory’s feasible methods before confirming scope, timing and cost. A requested test is not automatically an agreed or completed test.

Request FT232RN.

Send the quantity, required arrival date and destination. We review our inventory and established supply relationships, then confirm the offered lot, inspection and delivery terms.

Request a quotation

Include what your receiving team needs.

Include the approved package, packing preference, host software or driver and any fixed device configuration. State which interface operations matter to receiving acceptance.

Inspection starts with an agreed part and lot, sample quantity, method, limits, report requirements and disposition of tested samples.

Your enquiry starts a supply review; it does not reserve a displayed quantity.

Image detailFit to view