Skip to content
Independent electronic component distributionChina supply. International business.[email protected]

Micron DDR4 MT40A purchasing

A search for MT40A leaves several production decisions open. Start with the memory organization and released package, then compare the complete speed, grade and revision fields.

Start with organization, then speed.

DDR4 component selection
Compare first
Density and x8 / x16
Then match
Package and speed
Preserve
Grade and revision
Separate purchase
Memory modules

Ordering and acceptance reference · supply confirmed by quotation

Start with the requirement you already have.

The comparison helps restore the fields a family search leaves out. Follow an exact-device page where available, or send the complete code through the enquiry form.

Order / recordWhat it meansBefore you accept
MT40A512M16TB-062E:R512M x16 / 8 Gbit DDR4Retain TB, -062E and :R; use the exact-device page.
MT40A1G16TD-062EAAT:F1G x16 / 16 Gbit DDR4Retain TD, AAT and :F; it is not the same density or revision.
Component versus DIMMA soldered IC is different from an assembled memory moduleState the actual BOM item before comparing a module offer.

Bring the design constraint into the buying decision.

Select a purchasing issue to see what needs agreement before a lot is accepted.

Recover the device density.

A 512M x16 and a 1G x16 device both use x16 organization, but have different bit capacities. Obtain the complete released code and package mapping. Increasing density can change controller configuration and address mapping even when a package looks similar.

Include in your enquiry
Full MT40A code, density, package and controller support.
Supplied warehouse photograph. It illustrates storage operations, not current MT40A inventory.

Keep the assembly requirement with the shortage buy.

For industrial computers and embedded controller boards, a missing DDR4 line can delay assembly even when the rest of the BOM is ready. Keep the exact memory requirement with your EMS receiving instructions so a fast delivery remains usable.

Confirm the useful first quantity, lot separation and receiving conditions with your assembly or service team.

Plan the shortage purchase

Read the fields. Keep the device context.

Explore this Micron documentation example. It belongs to a different memory; use the offered lot’s own label to establish identity and handling requirements.

For Micron DDR4 MT40A purchasingMT40A512M16TB-062E:R and MT40A1G16TD-062EAAT:F require their own offered-lot labels. The Micron field example below is for another memory, not evidence of either part’s stock.

Manufacturer documentation example

Micron
Standard bar-code label example

Select a marker on the image or a number below. Each field answers a different purchasing question.

Standard bar-code label example · Manufacturer documentation example
Select a numbered field to read it.
Micron CSN-11, Figure 24, page 38. Manufacturer example for MT48LC32M16A2TG-75:C; not an offered-lot label or current inventory.

Micron CSN-11 · Rev. BF, May 2026 · page 38 ↗

FIELD 01 / 06

Complete part number

MT48LC32M16A2TG-75:C

The part-number line preserves the full device and revision. Match your offered label to the released BOM; this older memory is only a field-reading example.

For your orderCopy your complete order code, including the colon revision.

Send the full label for the actual offered lot.

Discuss this requirement ↗
Read the component label guide · Decode an abbreviated Micron FBGA mark

Agree the acceptance brief before testing.

Identity, unused condition and the complete order code are essential. Your device’s programming, assembly and operating requirements still need their own checks.

Identity and package

Reconcile full MT40A code and package evidence before sampling.

Assembly readiness

Agree ball-condition, moisture and carrier checks for the actual lot.

Memory operation

Use the intended controller, timing/training settings and defined memory workload.

Agree the lot, sample count, method, fixture, limits, report and sample disposition. Electrical or specialised analysis depends on laboratory feasibility; it is not implied by an external visual inspection.

Send the requirement your board needs.

ICstoq reviews our inventory and established China supply relationships against the complete order code, quantity, required arrival date and destination. The quotation confirms the offered lot, inspection scope and delivery terms.

Send your enquiry

Include these details

  • Full MT40A code; density, organization and package
  • Controller/timing configuration and grade/revision limits
  • Carrier, lot separation, moisture requirements and memory-test coverage

Identify fixed requirements and any alternatives already approved by your engineering team. We agree feasible inspection work and sample acceptance before proceeding.

Image detailFit to view