ADC and DAC supply for acquisition boards.
For acquisition-card, digitizer and instrument manufacturers buying approved ADC and DAC lines. ICstoq reviews exact ADI and TI part requirements alongside grade, package, lot evidence and the test scope your build needs.

Buy for the signal chain your team has qualified.
Purchasing starts with the released converter code. Resolution alone does not capture the reference, driver, interface, timing or performance conditions used to qualify the board.

- Acquisition cards and digitizers
- Keep converter ordering code, channel configuration and host interface with the request. Include the approved clock and data-interface requirements when test planning needs them.
- Precision instruments and calibration
- Preserve the grade and the limits that matter to the measurement. State the input conditions, temperature and calibration method for any requested electrical test.
- Waveform and control outputs
- For a DAC line, retain the approved output architecture, reference and package. Send companion BOM lines separately if they are also short.
Bring a requirement your purchasing team can release.
Name the approved ADC or DAC, BOM revision and first useful quantity. Include ADI or TI companion lines that are also required; engineering approval remains specific to each line.
We review our own inventory and established supply relationships for the exact requirement. Source records, sample inspection and release criteria are agreed for the offered lot.
Send the approved BOM and acceptance requirementsTechnical context: ADI precision acquisition signal chains · TI data-acquisition applications.
Start with your approved part numbers
ADC and DAC requirements solve different jobs in a signal chain. Resolution alone is not a purchasing substitute: interface, output type, channel configuration, reference requirements and package can all matter to an approved design.
For example, Analog Devices describes AD420 as a 16-bit current-output DAC. Its ordering table lists AD420ARZ-32 and AD420ARZ-32-REEL separately. Keep the requested ordering model intact instead of reducing it to “AD420”.
Turn the BOM line into an acceptance requirement.
Fix the device identity before comparing the proposed lots.
Name the approved ADC or DAC, BOM revision and first useful quantity. Include ADI or TI companion lines that are also required; engineering approval remains specific to each line.
| Check | Why it matters | What to send |
|---|---|---|
| ADC or DAC identity | Equal resolution does not mean equal function. | Give the exact ordering code and approved manufacturer. |
| Package and ordering model | Carrier suffixes are part of the requested order configuration. | Preserve suffixes such as -REEL and state whether other carriers are acceptable. |
| Acceptance parameters | Output accuracy, dynamic behavior and interface operation are different tests. | Specify the parameters, limits and operating conditions you need checked. |
| Lot and delivery | Device specifications do not establish present stock or its packaging. | Add quantity, required date and any lot/date-code restrictions. |
Agree the evidence before release.
Define what needs to be verified before the order.
Top marking, lead or ball condition and source records support a lot review. They do not measure converter linearity, reference drift or amplifier performance.
If those properties determine acceptance, specify the relevant limits, test conditions, fixture and calibration requirements. Confirm feasibility and sampling before shipment, and name the engineering owner who reviews exceptions.
Inspection methods & laboratoriesSource documentation & traceability
Manufacturer references
Use the original technical documents to check device identity. These links are not an indication of authorization or current stock.
ADI AD420 and ordering modelsOfficial example: 16-bit current-output DAC; separate standard and reel ordering models.Manufacturer website · opens a new tabPurchasing content reviewed 2026-11-26.
Continue with the approved device.
Follow the exact part or series, then send the build requirement.
Use the existing part and series pages for model-specific ordering and label information. For an unlisted requirement, send the complete code and your purchasing conditions through the RFQ.
Before you enquire
Who should approve a different device or grade?
Your engineering or approved-component owner should authorize the change in writing. Purchasing can then compare supply for that specific approved alternative; a family match alone is insufficient.
What should an EMS buyer include with the RFQ?
Include the complete manufacturer code, released BOM revision, quantity, required arrival date and receiving rules. Name who approves the source, inspection findings and any deviation before the lot is released.
Bring us your exact requirement.
Send the complete part number, BOM revision, quantity and required arrival date. Include who approves the source and the acceptance evidence your receiving team needs.