XC3S400AN-4FG400I
The AN requirement includes in-system configuration Flash. Keep the full code and define the expected configuration state, especially when the existing product relies on self-contained boot.
Include the configuration memory in the brief.
- Family
- Spartan-3AN
- Package
- 400-ball BGA
- Speed field
- −4
- Grade field
- I
Ordering and acceptance reference · supply confirmed by quotation
Keep every ordering field in the comparison.
Select a code segment, then compare the offered identity with the released BOM. The source references below establish ordering context, not live availability.
| Order / record | What it means | Before you accept |
|---|---|---|
| AN versus A | AN provides in-system configuration Flash | Do not drop AN when comparing stock offers. |
| FG400 / FGG400 | Retain the material field with the footprint | Review material and assembly requirements separately. |
| XCN09001 | Special code XC3S400AN-4FG400I4100 transitions to the standard code | This row does not establish discontinuation of XC3S400AN-4FG400I. |
Resolve the decision behind the shortage.
Choose the situation that applies to your order. Each one changes what purchasing, engineering and the test owner need to agree.
Specify the expected image and protection state.
Record whether devices must arrive unprogrammed or with an agreed image. Include the boot mode and any application data stored with the configuration. Programming the FPGA and validating power-cycle boot are separate steps.
Delivery state, boot mode and controlled image identifier.
Read the complete notice row.
The XCN09001 entry concerns the 4100 special-order version and names the standard order code as its replacement. Do not turn that historical row into a blanket obsolete-stock claim for the standard part.
Complete offered code and applicable notice or exception.
Agree handling without erasing evidence.
Ask for the actual seal and exposure record and package-specific limits. Arrange sample opening, photography and any programming sequence so that handling evidence is recorded before the device is altered.
Packing condition, handling limits and permitted test operations.
Read the fields. Keep the device context.
Select a numbered field on this supplied manufacturer label to read its purpose. Field positions and handling limits vary by product and label generation.
For XC3S400AN-4FG400IUse the offered FG400 lot’s handling information. This Spartan-6 example explains label fields only; its MSL and peak-body temperature are not the XC3S400AN assembly specification.
Manufacturer product label
AMD / Xilinx
XC6SLX9-2FTG256I
Select a marker on the image or a number below. Each field answers a different purchasing question.

Complete FPGA code
Retain the device, speed, package and final grade character. An offer for XC6SLX9 alone leaves essential ordering details unresolved.
Printed date code
DATE CODE is a distinct field. Keep it with the label and lot records rather than substituting a bag seal date or shipping date.
Quantity on this label
This manufacturer label shows a quantity of 346. The amount offered now, and any split-pack arrangement, must be confirmed in the quotation.
Customer product identifier
The customer product field is abbreviated in this image. It must not replace the complete manufacturer PART NUMBER above.
Moisture sensitivity
Record the MSL with the moisture-barrier bag, seal and opening history. The label alone does not tell you how long the devices have been exposed.
Peak body temperature
This is package-processing information. It is not the FPGA’s operating-temperature grade.
Diffusion and assembly
The label separately identifies country of diffusion and country of assembly. They describe different manufacturing stages.
For this FPGA, confirm -2, FTG256 and I, then agree lot, date-code and moisture-handling requirements.
Discuss this requirement ↗Agree the acceptance brief before testing.
Identity, unused condition and the complete order code are essential. Your device’s programming, assembly and operating requirements still need their own checks.
BGA condition
Record balls, substrate and markings against the FG400 drawing. An external visual result does not establish post-reflow joint quality.
Flash and protection
Agree read, blank-check, program and erase permissions. Do not change protected data or lockdown settings without explicit instructions.
Cold-start operation
If required, test the agreed internal-Flash boot sequence and recovery path on a suitable board with controlled firmware.
Does the cited 2009 notice discontinue this standard code?
Its relevant row discontinues the 4100 special-order code and lists XC3S400AN-4FG400I as the replacement. Read the notice scope; obtain current lifecycle and supply confirmation for the actual offer.
Does a successful JTAG connection prove the internal boot image?
No. Agree configuration-state verification and the intended boot test separately.
Agree the lot, sample count, method, fixture, limits, report and sample disposition. Electrical or specialised analysis depends on laboratory feasibility; it is not implied by an external visual inspection.
Make package observations reviewable.
This supplied report shows how orientation and terminal observations are recorded for AD5535BKBCZ. For the requested FPGA, use its actual package drawing and agreed criteria; the example’s results and dimensions cannot be transferred.
Explore inspection reportsSupport the board already in service.
A targeted component purchase can support your existing EMS or repair team. Keep the released design, service setup and receiving requirements together while sourcing the missing BOM line.
Plan an OEM / EMS shortage purchaseSelf-contained industrial control boards
A replacement must preserve the design’s configuration method, not just the FPGA density and package.
Field-maintained instruments
Keep boot images and any protected configuration state in the acceptance brief so repair stock is ready for the intended workflow.
Send the requirement your board needs.
ICstoq reviews our inventory and established China supply relationships against the complete order code, quantity, required arrival date and destination. The quotation confirms the offered lot, inspection scope and delivery terms.
Send your enquiryInclude these details
- XC3S400AN-4FG400I, any special-order suffix and approved FG/FGG material option
- Blank/programmed state, boot mode and permissions for Flash/protection operations
- BGA handling history, sample plan and agreed cold-start test
Identify fixed requirements and any alternatives already approved by your engineering team. We agree feasible inspection work and sample acceptance before proceeding.