Skip to content
Independent electronic component distributionChina supply. International business.[email protected]

XC7A200T-2FBG484I

Keep the −2 speed requirement and the 484-ball package together. Confirm that a proposed A200T lot supports the released board and timing target, with a clear inspection and delivery agreement.

A faster grade still needs the right footprint.

FBG484
Family
Artix-7
Body
23 × 23 mm
Speed field
−2
Grade field
I

Ordering and acceptance reference · supply confirmed by quotation

Keep every ordering field in the comparison.

Select a code segment, then compare the offered identity with the released BOM. The source references below establish ordering context, not live availability.

Selected code fieldArtix-7 A200T device identity.
Order / recordWhat it meansBefore you accept
−2FBG484IThe complete requirementSpeed, package and grade must survive an abbreviated stock search.
XC7A200T-2FBV484IXCN20011 names −2FBG484I as the corresponding replacementUse the specific transition, not a general equivalence claim.
Same density, another packageI/O and physical fit can differCheck the PCB and device/package table before discussing migration.

Resolve the decision behind the shortage.

Choose the situation that applies to your order. Each one changes what purchasing, engineering and the test owner need to agree.

Do not lose −2 when shortening the search.

An A200T search can return several speed and package combinations. Keep the full −2FBG484I code on the quotation. If −1 is proposed, the design owner must assess timing closure; a supplier’s general faster/slower statement is not release approval.

Include in your enquiry
Required speed, implemented timing target and permitted alternatives.

Read the fields. Keep the device context.

Select a numbered field on this supplied manufacturer label to read its purpose. Field positions and handling limits vary by product and label generation.

For XC7A200T-2FBG484IThe offered record must retain −2FBG484I. Read the example fields below, then obtain the actual A200T label and moisture limits; the example is for XC6SLX9.

Manufacturer product label

AMD / Xilinx
XC6SLX9-2FTG256I

Select a marker on the image or a number below. Each field answers a different purchasing question.

XC6SLX9-2FTG256I · Manufacturer product label · supplied photograph
Select a numbered field to read it.
Manufacturer product label · XC6SLX9-2FTG256I. Supplied photograph.
FIELD 01 / 07

Complete FPGA code

XC6SLX9-2FTG256I

Retain the device, speed, package and final grade character. An offer for XC6SLX9 alone leaves essential ordering details unresolved.

For your orderMatch the entire code to the released BOM.

For this FPGA, confirm -2, FTG256 and I, then agree lot, date-code and moisture-handling requirements.

Discuss this requirement ↗
Explore AMD / Xilinx label examples

Agree the acceptance brief before testing.

Identity, unused condition and the complete order code are essential. Your device’s programming, assembly and operating requirements still need their own checks.

Package dimensions

Use the FBG484 drawing and ball map. Specify any dimensional and ball-condition checks with the sampling plan.

Moisture and packing

Review the actual lot’s sealing and exposure record; agree the carrier and any approved conditioning with the assembly team.

Timing and workload

Functional acceptance must use the approved −2 design and stated conditions. Visual and marking inspections have a narrower purpose.

Can −1FBG676I be treated as the same A200T?

No. That comparison changes both speed grade and package. It requires engineering review rather than a purchasing substitution.

Does an inspection report guarantee my design’s throughput?

Only a defined functional test can address the workload it actually exercises. Agree the image, fixture, operating conditions and measured limits beforehand.

Agree the lot, sample count, method, fixture, limits, report and sample disposition. Electrical or specialised analysis depends on laboratory feasibility; it is not implied by an external visual inspection.

AD5535BKBCZ dimensional-report example. Its measured values do not apply to the requested device.

Tie a measurement to the right drawing.

The report format links measurements to identified samples and limits. For this requirement, name the correct package drawing and revision in the test brief. A dimensional pass concerns that scope, not configuration behaviour or authenticity by itself.

Explore inspection reports

Support the board already in service.

A targeted component purchase can support your existing EMS or repair team. Keep the released design, service setup and receiving requirements together while sourcing the missing BOM line.

Plan an OEM / EMS shortage purchase

Machine-vision processing boards

A released high-throughput design can depend on its timing target and routed interfaces. Keep them in the sourcing brief.

Test and signal-processing systems

Obtain the exact missing component while your EMS retains the approved PCB and acceptance process.

Send the requirement your board needs.

ICstoq reviews our inventory and established China supply relationships against the complete order code, quantity, required arrival date and destination. The quotation confirms the offered lot, inspection scope and delivery terms.

Send your enquiry

Include these details

  • XC7A200T-2FBG484I and any approved −2FBV484I transition
  • Implemented timing target, image version and interfaces to exercise
  • 484-ball package acceptance, lot handling record and test conditions

Identify fixed requirements and any alternatives already approved by your engineering team. We agree feasible inspection work and sample acceptance before proceeding.

Image detailFit to view