XC7A200T-2FBG484I
Keep the −2 speed requirement and the 484-ball package together. Confirm that a proposed A200T lot supports the released board and timing target, with a clear inspection and delivery agreement.
A faster grade still needs the right footprint.
- Family
- Artix-7
- Body
- 23 × 23 mm
- Speed field
- −2
- Grade field
- I
Ordering and acceptance reference · supply confirmed by quotation
Keep every ordering field in the comparison.
Select a code segment, then compare the offered identity with the released BOM. The source references below establish ordering context, not live availability.
| Order / record | What it means | Before you accept |
|---|---|---|
| −2FBG484I | The complete requirement | Speed, package and grade must survive an abbreviated stock search. |
| XC7A200T-2FBV484I | XCN20011 names −2FBG484I as the corresponding replacement | Use the specific transition, not a general equivalence claim. |
| Same density, another package | I/O and physical fit can differ | Check the PCB and device/package table before discussing migration. |
Resolve the decision behind the shortage.
Choose the situation that applies to your order. Each one changes what purchasing, engineering and the test owner need to agree.
Do not lose −2 when shortening the search.
An A200T search can return several speed and package combinations. Keep the full −2FBG484I code on the quotation. If −1 is proposed, the design owner must assess timing closure; a supplier’s general faster/slower statement is not release approval.
Required speed, implemented timing target and permitted alternatives.
Retain the documented order-code pair.
AMD XCN20011 explicitly pairs −2FBV484I with −2FBG484I. Record that transition if the BOM still uses the older form. Keep the material record and receiving acceptance aligned rather than treating all FBG/FBV codes as equivalent.
Old BOM code, proposed code and change acceptance.
Make performance a measurable acceptance condition.
Define the real input data, clocking and interfaces for a vision or signal-processing board. Specify test duration and environmental conditions where relevant. A successful device identification does not prove throughput or timing margins.
Fixture, image, interface rate and pass/fail limits.
Read the fields. Keep the device context.
Select a numbered field on this supplied manufacturer label to read its purpose. Field positions and handling limits vary by product and label generation.
For XC7A200T-2FBG484IThe offered record must retain −2FBG484I. Read the example fields below, then obtain the actual A200T label and moisture limits; the example is for XC6SLX9.
Manufacturer product label
AMD / Xilinx
XC6SLX9-2FTG256I
Select a marker on the image or a number below. Each field answers a different purchasing question.

Complete FPGA code
Retain the device, speed, package and final grade character. An offer for XC6SLX9 alone leaves essential ordering details unresolved.
Printed date code
DATE CODE is a distinct field. Keep it with the label and lot records rather than substituting a bag seal date or shipping date.
Quantity on this label
This manufacturer label shows a quantity of 346. The amount offered now, and any split-pack arrangement, must be confirmed in the quotation.
Customer product identifier
The customer product field is abbreviated in this image. It must not replace the complete manufacturer PART NUMBER above.
Moisture sensitivity
Record the MSL with the moisture-barrier bag, seal and opening history. The label alone does not tell you how long the devices have been exposed.
Peak body temperature
This is package-processing information. It is not the FPGA’s operating-temperature grade.
Diffusion and assembly
The label separately identifies country of diffusion and country of assembly. They describe different manufacturing stages.
For this FPGA, confirm -2, FTG256 and I, then agree lot, date-code and moisture-handling requirements.
Discuss this requirement ↗Agree the acceptance brief before testing.
Identity, unused condition and the complete order code are essential. Your device’s programming, assembly and operating requirements still need their own checks.
Package dimensions
Use the FBG484 drawing and ball map. Specify any dimensional and ball-condition checks with the sampling plan.
Moisture and packing
Review the actual lot’s sealing and exposure record; agree the carrier and any approved conditioning with the assembly team.
Timing and workload
Functional acceptance must use the approved −2 design and stated conditions. Visual and marking inspections have a narrower purpose.
Can −1FBG676I be treated as the same A200T?
No. That comparison changes both speed grade and package. It requires engineering review rather than a purchasing substitution.
Does an inspection report guarantee my design’s throughput?
Only a defined functional test can address the workload it actually exercises. Agree the image, fixture, operating conditions and measured limits beforehand.
Agree the lot, sample count, method, fixture, limits, report and sample disposition. Electrical or specialised analysis depends on laboratory feasibility; it is not implied by an external visual inspection.
Tie a measurement to the right drawing.
The report format links measurements to identified samples and limits. For this requirement, name the correct package drawing and revision in the test brief. A dimensional pass concerns that scope, not configuration behaviour or authenticity by itself.
Explore inspection reportsSupport the board already in service.
A targeted component purchase can support your existing EMS or repair team. Keep the released design, service setup and receiving requirements together while sourcing the missing BOM line.
Plan an OEM / EMS shortage purchaseMachine-vision processing boards
A released high-throughput design can depend on its timing target and routed interfaces. Keep them in the sourcing brief.
Test and signal-processing systems
Obtain the exact missing component while your EMS retains the approved PCB and acceptance process.
Send the requirement your board needs.
ICstoq reviews our inventory and established China supply relationships against the complete order code, quantity, required arrival date and destination. The quotation confirms the offered lot, inspection scope and delivery terms.
Send your enquiryInclude these details
- XC7A200T-2FBG484I and any approved −2FBV484I transition
- Implemented timing target, image version and interfaces to exercise
- 484-ball package acceptance, lot handling record and test conditions
Identify fixed requirements and any alternatives already approved by your engineering team. We agree feasible inspection work and sample acceptance before proceeding.