Skip to content
Independent electronic component distributionChina supply. International business.[email protected]

FTDI · Component supply & purchasing

FT4232HQ

Keep all four channels accounted for. Request FT4232HQ with the package, channel map and host configuration used by your production equipment.

Package
QFN-64
UART channels
Four
MPSSE
A and B

INTERFACE AT A GLANCE

USB hostUSB Hi-Speed
FT4232HQ
AUART / MPSSEBUART / MPSSECUART / bit-bangDUART / bit-bang

Four channels do not mean four MPSSE engines. Keep the channel-to-target map with the requirement.

Keep the complete ordering requirement.

Resolve the package and carrier before comparing offers. The manufacturer references below establish device identity; the proposed lot and delivery terms are confirmed in your quotation.

Order / recordWhat it meansBefore you accept
FT4232HQFour-channel device, 64-pin QFNDo not replace HQ with HL or H-56Q without a footprint and design review.
FT4232HQ-TRAY / FT4232HQ-REELManufacturer-listed tray and reel formsSpecify original or accepted split packing and the quantity needed to release the fixture build.
Channel A / B versus C / DMPSSE is provided on A and BKeep target wiring and host channel selection aligned; a successful single-port check leaves other paths unverified.

Tell us what each channel must do.

A four-port fixture may enumerate correctly while one target path remains unusable. Build the acceptance procedure around the actual assignments.

Exercise every used UART.

List the role, baud rate and flow control for A, B, C and D. If the fixture operates ports concurrently, agree a concurrent traffic test and record error counts for each channel.

Include in your enquiry
A/B/C/D map, serial settings, simultaneous-use requirement, payload and duration.

The label record your receiving team needs.

Request a legible original outer label for the offered material. Compare it with the quotation and receiving record before a split reel or tray loses its connection to the original pack.

Use the illustrated FTDI guide to separate a package label, a laboratory shipment record and the chip’s top marking.

Explore FTDI labels and markings

FT4232HQ · receiving record

Package identity
FT4232HQ

Retain HQ. Similar FT4232H family names can refer to different physical packages.

Carrier identity
TRAY or REEL

Copy the full offered order form and link each split quantity to its original label record.

Configuration record
Separate from the packing label

Ask for the approved host and EEPROM configuration independently; the outer label does not document your channel map.

Agree what the inspection must answer.

Identity, unused condition and a correct label matter. Application acceptance also depends on the interface, configuration and test conditions below.

Package and terminal review

Agree QFN outline, exposed-pad and terminal images, marking consistency and dimensions. Record the observations against the sampled lot.

Four-channel acceptance

Identify every used channel and its role. Set individual pass criteria, plus concurrent traffic conditions if the fixture relies on them.

Programming path

For A/B MPSSE use, agree the protocol, clock, target and known operation. USB enumeration or one UART loopback does not establish that the programming path works.

Agree the sampled lot, sample count, method, equipment, limits, report and disposition before work starts. Specialised functional testing is subject to laboratory feasibility and the agreed scope.

Can all four channels run MPSSE?

No. FTDI documents MPSSE on channels A and B. Plan C and D around their supported UART or bit-bang functions.

Can FT4232H-56Q be accepted as HQ?

It is a different package. A family-level match is insufficient; engineering must approve the footprint and relevant design differences.

Look closely. Record the observation.

Visual inspection can document package condition and surface observations. Functional testing needs its own agreed procedure.

For this FT4232HQ enquiry, request images and findings for the actual offered lot.

How to read a component inspection report

Where a shortage can stop the build.

ICstoq reviews your requirement against our inventory and established China supply relationships. Keep the approved BOM line intact while we confirm a suitable lot, quantity and delivery window.

Coordinate an OEM / EMS shortage buy

Production-test and programming-fixture manufacturers

The released fixture may connect several targets through one USB connection. Exact-part supply avoids reopening a qualified channel map during a scheduled fixture build.

Industrial multiport and instrumentation manufacturers

Keep host selection, serial-port allocation and concurrent-use conditions in the RFQ. Incoming checks should reflect the channels that the finished equipment actually uses.

Request FT4232HQ for your build.

Send the quantity, required arrival date and destination. Include the conditions below so we can review supply and inspection together.

Send your FT4232HQ enquiry

Useful details for this device

  • FT4232HQ with required tray/reel format and quantity.
  • Channel A/B/C/D roles; MPSSE assignments limited to A/B.
  • Host configuration, concurrent-use requirement and per-channel acceptance procedure.
Image detailFit to view