STM32L452RET6
Buy L452RET6 for the released 64-pin LQFP board. Confirm the absence of the P power-option suffix, the required low-power behaviour and the carrier your assembly line accepts.
Keep the T package and standard LDO pinout.
- Flash
- 512 KB
- Body
- 10 × 10 mm
- Grade range
- −40 to +85°C
- Packing
- Tray
Manufacturer ordering reference · availability confirmed by quotation
Decode the code before you compare the offer.
Select a code segment to see its role. Keep the complete manufacturer order code on the quotation, BOM and receiving record.
| Order / record | What it means | Before you accept |
|---|---|---|
| RET6 / REY6TR | LQFP64 versus WLCSP64. | The same RE device prefix does not establish board compatibility. |
| RET6 / RET6P | Standard LDO version versus dedicated pinout for external SMPS. | Retain the power option in any proposed alternative and obtain a schematic review. |
| RET6 / RET6TR | Tray versus reel packing. | A carrier change may be discussed with the EMS without creating a new device requirement. |
Set the buying conditions for your build.
Choose the situation closest to your requirement. These details help purchasing, engineering and the assembly team review the same offer.
Keep a P proposal visible.
The additional P is a power-pinout choice, not a distributor packing abbreviation. Let engineering check the supply schematic before a RET6P offer enters the accepted BOM.
Standard LDO requirement and approved supply schematic.
Make the current measurement repeatable.
For a portable instrument, specify the firmware, supply, temperature and peripherals left active in sleep. A board-level current number can include regulators and sensors as well as the MCU.
Measurement boundary, mode, wake source and maximum current.
Agree reel or tray before dispatch.
If the line accepts RET6TR, confirm leader/trailer and split-reel requirements. Keep lot identifiers and quantities separate when a shortfall is fulfilled from more than one pack.
Carrier preference, lot split policy and first production quantity.
Read identity and handling as separate records.
The product label connects the full order code, lot and quantity. The moisture label records handling conditions. Use this actual STM32H757 example to locate the fields; obtain the offered STM32L452RET6 pack’s own limits before assembly.
Packaging-handling label
STMicroelectronics
STM32H757 handling-label example
Select a marker on the image or a number below. Each field answers a different purchasing question.

Sensitivity level
This caution label states moisture sensitivity. It does not contain the complete device order code; keep the product label or top mark with it.
Bag seal date
The seal date is a packaging event. If the bag has been opened or resealed, ask for that history separately.
Peak package temperature
This value concerns package assembly processing. It is not the permitted operating temperature of an STM32 device.
Exposure window and conditions
Read the time together with its stated conditions. A clock without temperature and humidity context is not a complete handling record.
Storage and baking references
The lower text describes storage and actions if conditions are exceeded. Baking must follow the applicable device, carrier and process requirements.
For the MCU you are buying, request its own label limits and opening history. The values in this example are not handling specifications for another STM32 device.
Discuss this requirement ↗For STM32L452RET6
RET6 LQFP64 and standard LDO configuration, without unapproved P option. Tray/reel acceptance, split-pack rules and required arrival date.
Turn the concern into an agreed inspection.
Original identity, unused condition and a correct order code are essential. Programming, handling and application behaviour need their own acceptance conditions.
Leads and marking
Inspect all four lead rows and package condition; compare the full code with the LQFP64 drawing.
Supply and firmware
Use the standard-LDO board configuration and the released image for the agreed sample check.
Sleep and wake
Record the operating mode, RTC and I/O state, instrument setup and limits so low-power findings can be reproduced.
Is P just another packing suffix?
No. ST identifies P as a dedicated pinout supporting an external SMPS. Treat it as a technical option.
Can WLCSP REY6TR replace RET6?
Not on the same footprint. Its assembly and handling requirements differ even though memory capacity matches.
Before testing, agree the lot, sample count, method, fixture, limits, report and sample disposition. Electrical and specialised checks depend on laboratory feasibility; they are not implied by a visual inspection.
Define the work before the sample reaches the lab.
Inspection starts with a question the laboratory can answer. Agree the method and permissions before a sample is opened, programmed or otherwise changed. The photograph illustrates the inspection workflow, not a test already performed on this requirement.
Keep the report connected to the sample, method and agreed limits. Review any exceptions before the lot is released.
Explore inspection report examplesWhere an exact-part shortage matters.
Keep your current EMS or assembly partner. A targeted purchase can address the missing BOM line while the approved design and receiving requirements stay under your control.
Coordinate an OEM / EMS shortage buyPortable measurement equipment
A released LQFP board may need a shortfall purchase while the OEM keeps the existing power and firmware design.
Industrial sensor controllers
Receiving should preserve low-power modes, I/O configuration and leaded-package assembly conditions.
Bring the complete requirement.
ICstoq reviews our inventory and established China supply relationships against your quantity, required arrival date and destination. The quotation confirms the offered lot, packing, inspection and delivery terms.
Send your STM32L452RET6 enquiryUseful details for this enquiry
- RET6 LQFP64 and standard LDO configuration, without unapproved P option
- Tray/reel acceptance, split-pack rules and required arrival date
- Sleep/wake firmware, current-measurement boundary and acceptance limits
Tell us which conditions are fixed and which need discussion. Any alternative requires your approval before it replaces the requested part.