TPS1H100AQPWPRQ1
For load-control and I/O board OEMs and their EMS partners: retain A-version diagnostics, the PWP package and Q1 requirement when buying TPS1H100AQPWPRQ1. Agree the offered lot, packing and load-test limits before release.
- Function
- Single-channel high-side switch
- A version
- Open-drain ST status
- Packing
- PWP 14-pin · tape and reel
Buy to the requirement your board needs.
An automotive body-control or power-distribution build may be waiting on one switch. Keep the released diagnostic circuit and current-limit setup intact when buying a shortage quantity.
The diagnostic output changes.
TPS1H100A provides an open-drain ST status output; the B version uses a current-sense output. A shared family name does not make these a purchasing substitution. Preserve AQPWPRQ1 in the BOM, offer and original label.
Exact A-version requirement and any formally approved alternatives.
Specify the circuit used for acceptance.
The device operates with an external current-limit setting and a particular load. Agree supply, resistor setting, load type, inrush and temperature for a functional test. A visual pass cannot confirm current limiting or fault signalling.
Board/fixture, current-limit setting, load conditions and diagnostic pass criteria.
Keep each offered lot separate.
The supplied photographs include carton records with different date codes. The original reel label shows 2,000 pieces, while one test-shipment label shows 1,999. Reconcile original quantity, samples and dispatch quantity from the records; do not assume the reason for the difference.
Accepted date codes, split-lot policy and net production quantity.
Review the supplied shipment record.
Open a photograph to inspect the original detail. These records illustrate past handling and supply; the offered lot and available quantity are confirmed in your quotation.
Read the label with its purchasing context.
Select a numbered field for its meaning and the detail to confirm before accepting an offer.
TI original bag-label example
Texas Instruments
TPS1H100AQPWPRQ1
Select a marker on the image or a number below. Each field answers a different purchasing question.

Exact A-version code
The full label code retains the A diagnostic version and packing suffix. Do not accept a B-version substitution on family-name similarity alone.
Date code
The date-code field belongs to this pack. Other cartons in the shipment images show other date codes.
Original pack quantity
This is the original label quantity. A sample or dispatch record can show a different count and needs reconciliation.
Moisture and seal record
The seal date records a packing event. It is separate from date code 2306 and does not prove the pack remained unopened.
Lot and trace fields
These fields cannot be verified from the public image. Do not infer their values from the date code or revision field.
Keep the original record with the offered lot and agreed inspection scope.
Discuss this requirement ↗Agree the test before releasing samples.
Specify the lot, sample count, method, fixture, limits, report and disposition of tested samples. Confirm laboratory feasibility before committing to electrical or specialised work.
Identity and handling
Match the complete ordering code, package, carrier and readable lot record. Review MSL handling, seal history, HIC/desiccant and the condition of leads and exposed pad before assembly.
Electrical and load checks
Use an agreed fixture for on-state behaviour, current limit and ST fault indication. Specify the supply, load, resistor, temperature and acceptable results. Confirm which protection functions can be safely exercised.
Automotive documentation
Q1 identifies the qualified product family; the label alone does not satisfy every automotive receiving requirement. Name required traceability, certificates or customer approval documents before committing the order.
Can TPS1H100B be supplied if A is unavailable?
Only after your engineering approval. The diagnostic function differs, so the circuit, software and acceptance checks must support the proposed change.
Are all cartons shown one available lot?
No. These are historical shipment photographs with distinct date-code records. We confirm the offered quantity, lot separation and delivery in a quotation; the gallery is not a live inventory balance.
Does the sample-shipment image mean White Horse tested it?
No. The visible destination is HK Top Chips Test Technology. Testing provider, report identity and results must be confirmed from the actual documents for the offered lot.
Order the switch your released board expects.
Body electronics, controlled resistive or inductive loads and board-level power distribution are relevant purchasing contexts. A spot purchase can bridge an allocation gap, support service parts or unblock an EMS shortage. Your engineering team still owns the approved circuit and any substitution decision.
Plan an OEM / EMS shortage purchaseBring the exact requirement.
ICstoq is an independent distributor with our own inventory and established supply relationships. Send the quantity, arrival date and destination; we confirm the offered lot, inspection and delivery in your quotation.
Request TPS1H100AQPWPRQ1Include these details
- TPS1H100AQPWPRQ1 A-version requirement and approved carrier
- Current-limit resistor, supply/load conditions and ST diagnostic acceptance
- Date-code/lot policy, net usable quantity and required automotive documents
Keep diagnostics and load acceptance in the purchase.
The OEM owns the released output function. The EMS buyer needs a complete identity and receiving brief, not only a family name.
See the TI purchasing hubDiagnostic version
TI identifies version A with an open-drain status output; version B has an analogue current-sense output. Do not exchange them without engineering approval of the circuit and diagnostic behaviour.
Load-test scope
State supply conditions, load type, inrush profile, current-limit setting and required fault response. Agree fixture safety and numerical limits before any powered test.
Receiving and release
Retain the PWP / Q1 order fields, permitted date codes and original pack record. For an EMS build, name the OEM source-approval owner and the person authorised to release the inspection report.