Skip to content
Independent electronic component distributionChina supply. International business.[email protected]

Kintex UltraScale+ purchasing

A Kintex UltraScale+ shortage buy must preserve the board’s interfaces, power and assembly requirements. Use the complete device, package and speed/temperature fields before comparing supply options.

Keep the interfaces, not just the density.

KU device · package · grade
Start with
Complete KU…P code
Board dependency
I/O & transceivers
Assembly
Package & cooling
Test basis
Actual workload

Ordering and acceptance reference · supply confirmed by quotation

Start with the requirement you already have.

The comparison helps restore the fields a family search leaves out. Follow an exact-device page where available, or send the complete code through the enquiry form.

Order / recordWhat it meansBefore you accept
XCKU5P-1SFVB784EExisting shipment-backed requirementOpen its exact-code page and packing evidence.
KU5P / KU11P / KU15PRelated family searchesResolve the full package and grade; family membership does not establish pin compatibility.
Speed and low-power optionsSeparate ordering decisionsCheck the applicable electrical conditions and implementation before accepting a change.

Bring the design constraint into the buying decision.

Select a purchasing issue to see what needs agreement before a lot is accepted.

Preserve the routed interfaces.

List the transceiver lanes, I/O bank needs and external memory interface used by the released board. A larger device can still expose a different set of connections in another package. Give engineering the full proposed code before treating the quote as equivalent.

Include in your enquiry
Device/package, used interfaces and PCB revision.
XCKU5P-1SFVB784E shipment packing marked for White Horse Laboratories. Dispatch evidence, not a test-pass certificate or current-stock claim.

Connect the shipment record to the requirement.

This supplied XCKU5P-1SFVB784E image documents protective packing and dispatch information for laboratory testing. It is useful evidence of the handling workflow. It does not establish the result of that testing or the condition of a different offered lot.

Confirm the useful first quantity, lot separation and receiving conditions with your assembly or service team.

Plan the shortage purchase

Read the fields. Keep the device context.

Select a numbered field on this supplied manufacturer label to read its purpose. Field positions and handling limits vary by product and label generation.

For Kintex UltraScale+ purchasingThe example below is an XC6SLX9 manufacturer label. Use it to distinguish identity from handling, then obtain the actual Kintex lot’s own complete label and package limits.

Manufacturer product label

AMD / Xilinx
XC6SLX9-2FTG256I

Select a marker on the image or a number below. Each field answers a different purchasing question.

XC6SLX9-2FTG256I · Manufacturer product label · supplied photograph
Select a numbered field to read it.
Manufacturer product label · XC6SLX9-2FTG256I. Supplied photograph.
FIELD 01 / 07

Complete FPGA code

XC6SLX9-2FTG256I

Retain the device, speed, package and final grade character. An offer for XC6SLX9 alone leaves essential ordering details unresolved.

For your orderMatch the entire code to the released BOM.

For this FPGA, confirm -2, FTG256 and I, then agree lot, date-code and moisture-handling requirements.

Discuss this requirement ↗
Explore AMD / Xilinx label examples

Agree the acceptance brief before testing.

Identity, unused condition and the complete order code are essential. Your device’s programming, assembly and operating requirements still need their own checks.

BGA and package construction

Use the actual package drawing and define ball, substrate and surface criteria appropriate to that construction.

Supply and handling

Retain moisture/packing records for each proposed lot and coordinate opening or conditioning with the assembly team.

Configured interfaces

Agree what lanes, memory traffic and clocks the fixture exercises. Do not turn a limited test into a full-performance claim.

Agree the lot, sample count, method, fixture, limits, report and sample disposition. Electrical or specialised analysis depends on laboratory feasibility; it is not implied by an external visual inspection.

Send the requirement your board needs.

ICstoq reviews our inventory and established China supply relationships against the complete order code, quantity, required arrival date and destination. The quotation confirms the offered lot, inspection scope and delivery terms.

Send your enquiry

Include these details

  • Complete Kintex UltraScale+ device, package, speed and temperature grade
  • Used transceivers/I/O/memory interfaces, supply operating point and cooling constraints
  • Image/fixture owner, feasible inspection methods and workload acceptance limits

Identify fixed requirements and any alternatives already approved by your engineering team. We agree feasible inspection work and sample acceptance before proceeding.

Image detailFit to view