Skip to content
Independent electronic component distributionChina supply. International business.[email protected]

STM32G4 purchasing

Start with the family. Finish with the exact device your board can use. Compare G431 motor-control and G474 digital-power requirements before sending a shortage enquiry.

Buy for the control loop and the footprint.

G431 / G474
Keep fixed
Approved device
Agree separately
Packing & tests

Compare requirements below. Family members are not automatically interchangeable.

Choose the complete device requirement.

Open the part page for its order-code breakdown, application checks and RFQ brief. Packing options stay with the underlying device requirement.

Order / recordWhat it meansBefore you accept
STM32G431CBU3UFQFPN48 · 128 KB · −40 to +125°CPackage, temperature and the control loop all matter.
STM32G474MET6LQFP80 · 512 KB · −40 to +85°CThe M selects 80 pins. It is not optional text.
STM32G474RET6LQFP64 · 512 KB · grade 6Use the existing 64-pin page. MET6 uses LQFP80.

Can the same MCU family fit the same board?

Watch the G474MET6 and G431CBU3 comparison before accepting a different code for a replenishment order.

1 min 18 sec · Illustrative purchasing scenario. Package animation explains dimensions; it is not a PCB land pattern or an approved substitution.
Read the video transcript

Say a motor-drive BOM calls for this G four seventy-four. A supplier offers a G four thirty-one instead. I'd keep that offer separate until the customer's engineer has reviewed it.

These two codes use different packages. Eighty pins on one, forty-eight on the other. They cannot fit the same unchanged board.

The package bodies are twelve by twelve millimeters, and seven by seven. That is already a board-level difference, before we look at the program.

The G four seventy-four has five analog-to-digital converters and a high-resolution timer. The G four thirty-one has two converters, without that timer.

If the original design uses that high-resolution timer, an engineer needs to resolve the difference. More memory, or the same family name, doesn't settle that question.

Flash capacity and temperature grade differ here, too. Even with a matching package, the pin assignments, software and circuit still need review.

We'll quote the complete code the customer has approved. Any difference goes on a separate list for their engineer to confirm.

Send the full part number, quantity, required arrival date and special requirements. We'll check the supply options against that request.

Discuss your complete STM32 requirement

Resolve the decision that can stop receiving.

Pick the issue that matters to your build. Put the answer in the enquiry before a lot is offered.

Use the actual sampling and PWM path.

For G431 or G474 motor-control boards, specify the ADC channels, PWM outputs, timing relationship and protection inputs your firmware uses. Do not replace this acceptance brief with a request to see whether the MCU powers up.

Include in your enquiry
Board revision, control signals, firmware, safe fixture and timing limits.
Reels and protective bags in preparation · warehouse example, not a current G4 stock listing.

Keep the missing BOM line under control.

Motor drives and digital-power boards can share an STM32G4 family name while relying on different packages, timer resources and analog paths. Preserve the released requirement when time is short.

ICstoq can review inventory and established supply relationships for the exact code. Agree the first useful quantity and receiving conditions with your EMS before accepting a partial delivery.

Plan an OEM / EMS shortage purchase

Carry two records into receiving.

The ordering label establishes what was offered. The handling record states how that package must be treated. Neither replaces the agreed electrical or application check.

Packaging-handling label

STMicroelectronics
STM32H757 handling-label example

Select a marker on the image or a number below. Each field answers a different purchasing question.

STM32H757 handling-label example · Packaging-handling label · supplied photograph
Select a numbered field to read it.
Packaging-handling label · STM32H757 handling-label example. Supplied photograph.
FIELD 01 / 05

Sensitivity level

MSL 3

This caution label states moisture sensitivity. It does not contain the complete device order code; keep the product label or top mark with it.

For your orderRequest both the identity label and the handling label.

For the MCU you are buying, request its own label limits and opening history. The values in this example are not handling specifications for another STM32 device.

Discuss this requirement ↗

This photograph belongs to an STM32H757 handling example. Request the actual STM32G4 pack’s limits and opening history; do not transfer the example’s MSL or temperature values to a different device.

Explore the ST label guide

Define the inspection in three parts.

Start with the offered lot and the concern. Agree a feasible procedure before testing or changing sample state.

Identity and condition

Reconcile the full code, lot, pack and device evidence. Select package-specific visual checks: WLCSP or BGA balls, QFP leads, or QFN terminals and exposed pad.

Programming and protection

State blank or programmed requirements, option-byte restrictions and any approved revision. Reading identity, programming Flash and changing protection state are distinct permissions.

Application acceptance

Specify the interfaces and timing actually used, fixture, firmware, operating conditions and limits. Name the person who reviews findings and releases the lot.

See actual inspection-report examples

Bring the complete requirement.

ICstoq reviews our inventory and established China supply relationships against your quantity, required arrival date and destination. The quotation confirms the offered lot, packing, inspection and delivery terms.

Send your STM32G4 purchasing enquiry

Useful details for this enquiry

  • Full ordering code, package, grade and board/BOM revision
  • Useful first quantity, carrier, required arrival date and destination
  • Programming state, actual application checks and acceptance owner

Tell us which conditions are fixed and which need discussion. Any alternative requires your approval before it replaces the requested part.

Image detailFit to view