Skip to content
Independent electronic component distributionChina supply. International business.[email protected]

STM32G474MET6

Source the 80-pin G474 for a digital-power or motor-control build. Keep MET6 distinct from the 64-pin RET6 and agree which timing, analog and protection functions need inspection.

The M selects 80 pins. It is not optional text.

LQFP80
Flash
512 KB
Body
12 × 12 mm
Grade range
−40 to +85°C
Packing
Tray

Manufacturer ordering reference · availability confirmed by quotation

Decode the code before you compare the offer.

Select a code segment to see its role. Keep the complete manufacturer order code on the quotation, BOM and receiving record.

Selected code fieldDevice line
Order / recordWhat it meansBefore you accept
MET6LQFP80, 512 KB Flash, grade 6, tray packing.Match the 12 × 12 mm body and 80-pin board footprint, not just the G474 name.
MET6TRReel-packing option for the MET6 device requirement.Accept it only after the assembly team approves the carrier; keep the requirement on this page.
RET6 / MEY6TRRET6 uses LQFP64; MEY6TR is a different package form.The common G474 or ME text does not establish footprint compatibility.

Set the buying conditions for your build.

Choose the situation closest to your requirement. These details help purchasing, engineering and the assembly team review the same offer.

Specify the waveform and fault conditions.

If the design uses the high-resolution timer, the acceptance question is about the programmed waveform, ADC synchronisation and fault response at defined conditions. A label and successful Flash write cannot answer that question.

Include in your enquiry
Firmware, HRTIM outputs, ADC timing, fault behaviour and safe operating points.

Read identity and handling as separate records.

The product label connects the full order code, lot and quantity. The moisture label records handling conditions. Use this actual STM32H757 example to locate the fields; obtain the offered STM32G474MET6 pack’s own limits before assembly.

Packaging-handling label

STMicroelectronics
STM32H757 handling-label example

Select a marker on the image or a number below. Each field answers a different purchasing question.

STM32H757 handling-label example · Packaging-handling label · supplied photograph
Select a numbered field to read it.
Packaging-handling label · STM32H757 handling-label example. Supplied photograph.
FIELD 01 / 05

Sensitivity level

MSL 3

This caution label states moisture sensitivity. It does not contain the complete device order code; keep the product label or top mark with it.

For your orderRequest both the identity label and the handling label.

For the MCU you are buying, request its own label limits and opening history. The values in this example are not handling specifications for another STM32 device.

Discuss this requirement ↗

For STM32G474MET6
MET6 LQFP80; confirm whether MET6TR carrier is accepted. Lot/revision restrictions, tray condition and original-label record.

Read more ST labels and markings

Turn the concern into an agreed inspection.

Original identity, unused condition and a correct order code are essential. Programming, handling and application behaviour need their own acceptance conditions.

80-pin package condition

Record lead deformation, contamination and evidence relevant to previous use. Confirm the package dimensions against the applicable drawing if dimensional checks are agreed.

Programming and revision

Keep approved firmware, option-byte settings and any silicon-revision restriction with the test request. Do not infer an approved revision from a commercial date code.

Power-control function

Agree HRTIM, analog acquisition and fault-input procedures with the lab. Specify fixture, measurement points, limits and whether programmed samples can return to production.

Is MET6 the same package as RET6?

No. MET6 is the 80-pin LQFP option; RET6 is the 64-pin LQFP option. Keep the footprint and complete code together when requesting supply.

Can inspection confirm the whole converter design?

Component checks answer the agreed sample questions. Qualification of the assembled converter, including its power stage and operating envelope, remains a separate engineering activity.

Before testing, agree the lot, sample count, method, fixture, limits, report and sample disposition. Electrical and specialised checks depend on laboratory feasibility; they are not implied by a visual inspection.

Laboratory inspection equipment · supplied process photograph.

Evidence your receiving team can use.

Keep the original label, sample identity and report reference connected. Ask for clear observations and measured results for the agreed scope, including any exceptions that need review before release.

Open the report guide to see actual examples of packaging, terminal condition, surface checks and dimensional records.

Explore inspection report examples

Where an exact-part shortage matters.

Keep your current EMS or assembly partner. A targeted purchase can address the missing BOM line while the approved design and receiving requirements stay under your control.

Coordinate an OEM / EMS shortage buy

Digital power supplies and converters

A controller shortage can delay an otherwise complete power board. Preserve the approved timing and analog paths while reviewing a first useful delivery.

Motor-drive equipment

The 80-pin layout may carry signals absent from a smaller package. A family match is only the beginning of the purchasing check.

Bring the complete requirement.

ICstoq reviews our inventory and established China supply relationships against your quantity, required arrival date and destination. The quotation confirms the offered lot, packing, inspection and delivery terms.

Send your STM32G474MET6 enquiry

Useful details for this enquiry

  • MET6 LQFP80; confirm whether MET6TR carrier is accepted
  • Lot/revision restrictions, tray condition and original-label record
  • HRTIM/ADC/fault test needs, firmware, fixture and sample disposition

Tell us which conditions are fixed and which need discussion. Any alternative requires your approval before it replaces the requested part.

Image detailFit to view