LTC2942CDCB#TRMPBF
Do not add -1 to LTC2942CDCB#TRMPBF during quotation matching. This is the external-sense requirement; the -1 option changes the sensing arrangement and is not a formatting variation.
Legacy battery monitor
- Sense arrangement
- External shunt; no -1
- Service decision
- Obsolete model, released host behaviour
Ordering and acceptance reference · supply confirmed by quotation
Keep every ordering field in the comparison.
Select a code segment, then compare the offered identity with the released BOM. The source references below establish ordering context, not live availability.
| Order / record | What it means | Before you accept |
|---|---|---|
| No -1 | External sense resistor required. | Do not accept the integrated-shunt version as a suffix cleanup. |
| C grade | Datasheet specifies 0°C to 70°C for this grade. | Match the temperature requirement, not only package dimensions. |
| Lifecycle | ADI now marks LTC2942 obsolete. | A historical replacement listing is not a current factory-supply commitment. |
Resolve the decision behind the shortage.
Choose the situation that applies to your order. Each one changes what purchasing, engineering and the test owner need to agree.
Preserve the measurement circuit
Do not add -1 while matching a quotation. The existing shunt and host scaling belong to the released board; another sensing arrangement needs circuit approval.
Send the external resistor value and complete order code without -1.
Recheck the status of the proposed part
A 2020 notice named non-1 devices as replacement options for integrated-shunt models. The current LTC2942 product page is itself obsolete. Treat both exact service supply and redesign as explicit, separate choices.
State whether this is exact service replacement or an engineering-approved migration.
Include the measurements the host uses
If the product reads charge, voltage and temperature, an I²C acknowledgement alone is inadequate. Agree current integration and the voltage/temperature points needed for your board.
Provide host settings, test points and allowable errors.
Connect the label to the right record.
Explore the LTM8071 device top marking below. This is a different device, used to explain the record. The offered part needs its own manufacturer label and lot evidence.
For LTC2942CDCB#TRMPBFFor this legacy code, the manufacturer pack label must confirm C grade and the absence of -1. The LTM8071 top-mark example is educational and belongs to another part.
Device top marking
Analog Devices / Linear Technology
LTM8071
Select a marker on the image or a number below. Each field answers a different purchasing question.

Visible device mark
The Y belongs to the visible device/package marking. It does not identify all temperature-grade and delivery suffixes in an orderable LTM8071 code.
Additional trace string
Keep the original marking photograph with the package label. Do not assign a date or grade from these characters without the applicable marking reference.
Package orientation
The visible dot helps orient the package. Power-module acceptance still depends on the agreed electrical conditions and assembly record.
For LTM8071, confirm the full grade and carrier code. A matching package mark does not resolve ripple, load or efficiency acceptance conditions.
Discuss this requirement ↗Agree the acceptance brief before testing.
Identity, unused condition and the complete order code are essential. Your device’s assembly and operating requirements still need their own checks.
Order identity
Confirm CDCB#TRMPBF without -1, plus the manufacturer label and actual lot/pack records.
Electrical scope
Use the released external shunt and scaling. Define charge interval, voltage inputs and temperature conditions for the requested checks.
Service release
Separate IC screening from validation of the repaired monitor. Agree the calibration and firmware revision used for final acceptance.
Agree the lot, sample count, method, fixture, limits, report and sample disposition. Electrical or specialised analysis depends on laboratory feasibility; it is not implied by an external visual inspection.
Put the test brief before the sample.
The laboratory workflow starts with the question to be answered. Agree how samples are identified, which operations may change them, and who reviews the findings. The photograph illustrates that workflow, not the status of an offered lot.
Explore inspection reportsSupport the board already in service.
A targeted component purchase can support your existing EMS or repair team. Keep the released circuit, calibration baseline and receiving requirements together while sourcing the missing line.
Plan an OEM / EMS shortage purchasePortable instrument repair
Exact non-1 supply can preserve an external-shunt board that would otherwise need redesign.
Installed equipment support
A phased service buy can separate immediate repair demand from longer-term replacement planning.
Send the requirement your board needs.
ICstoq reviews our inventory and established China supply relationships against the complete order code, quantity, required arrival date and destination. The quotation confirms the offered lot, inspection scope and delivery terms.
For spot requirements on released boards and service equipment. Laboratory inspection is arranged before shipment; agree the laboratory, sample plan and test limits with the quotation.
Send your enquiryInclude these details
- LTC2942CDCB#TRMPBF without -1 and required quantity/date
- External shunt, host scaling and calibration baseline
- Charge, voltage and temperature acceptance points
Identify fixed requirements and any alternatives already approved by your engineering team. We agree feasible inspection work and sample acceptance before proceeding.