MT29F256G08AUCABPB-10ITZ:A
For an embedded-storage production gap, the full NAND code and controller configuration matter more than a capacity match. Preserve :A and agree how ECC, bad blocks and programming will be handled.
Match the NAND to its controller.
- Order field
- AUCABPB
- Speed / grade
- -10ITZ
- Revision
- :A
- Acceptance owner
- Controller / firmware team
Ordering and acceptance reference · supply confirmed by quotation
Keep every ordering field in the comparison.
Select a code segment, then compare the offered identity with the released BOM. The source references below establish ordering context, not live availability.
| Order / record | What it means | Before you accept |
|---|---|---|
| Full order code | Micron maintains an exact-device reference | Reconcile the offered code including :A against the released BOM. |
| Raw NAND | Management is a system responsibility | Obtain the controller requirements and supported device geometry. |
| Bad-block policy | Factory markers and test failures are different records | Define the acceptance rule from the applicable device specification. |
Resolve the decision behind the shortage.
Choose the situation that applies to your order. Each one changes what purchasing, engineering and the test owner need to agree.
Compare the geometry and ECC requirement.
Page size, spare-area use, addressing and controller ECC capability can determine whether a NAND is usable. Have the design owner compare the actual data sheets and firmware support. Capacity alone cannot release an alternate.
Controller, firmware version and supported geometry/ECC requirements.
Preserve the original markers.
Agree whether the tool reports factory-marked blocks, newly failing blocks or verification errors. Keep the original bad-block record and define how the image skips blocks. Do not demand an informal zero-bad-block result or overwrite markers during screening.
Bad-block policy, image placement and programmer algorithm.
Make revision acceptance explicit.
Keep the complete offered revision with its lot evidence. If a change is allowed, validate the controller and manufacturing algorithm against that device before committing the production quantity. A generic memory read is insufficient for a boot or filesystem use case.
Approved revision, qualification owner and production-test coverage.
Read the fields. Keep the device context.
Explore this Micron documentation example. It belongs to a different memory; use the offered lot’s own label to establish identity and handling requirements.
For MT29F256G08AUCABPB-10ITZ:ARetain AUCABPB-10ITZ:A in the offered identity. The manufacturer example illustrates field purposes only; it does not demonstrate a label or test result for this NAND.
Manufacturer documentation example
Micron
Standard bar-code label example
Select a marker on the image or a number below. Each field answers a different purchasing question.

Complete part number
The part-number line preserves the full device and revision. Match your offered label to the released BOM; this older memory is only a field-reading example.
Container quantity
This is the labelled container quantity in the manufacturer example. It is not today’s available balance or the quantity committed to your order.
Trace reference
Retain the complete printed trace string with the label and the corresponding receiving record. Do not shorten it when reporting a discrepancy.
Date record
Keep this date field separate from sealing, repacking and inspection dates. Its example value does not describe the material quoted for your order.
Handling conditions
The example prints a moisture classification with temperature conditions. Use the applicable product and lot instructions; do not transfer these limits to another Micron memory.
Machine-readable record
Keep a readable image of the complete label. Micron notes that bar codes can include additional information; a successful scan alone does not authenticate the device.
Send the full label for the actual offered lot.
Discuss this requirement ↗Agree the acceptance brief before testing.
Identity, unused condition and the complete order code are essential. Your device’s programming, assembly and operating requirements still need their own checks.
Marking and traceability
Match full label, device marking, package and revision; record lot separation.
Raw-NAND operations
Agree ECC settings, marker preservation, erase permissions and read/program/erase coverage before testing.
System use
Use the intended controller and approved image to test boot or storage behaviour. State the exercised workload and limits.
Is this interchangeable with a 32 GB eMMC?
No. Raw NAND and managed eMMC present different interfaces and responsibilities to the host.
Should every factory bad block fail incoming inspection?
Use the device-specific allowance and your agreed policy. First distinguish original bad-block markers from faults created or detected during testing.
Agree the lot, sample count, method, fixture, limits, report and sample disposition. Electrical or specialised analysis depends on laboratory feasibility; it is not implied by an external visual inspection.
Tie a measurement to the right drawing.
The report format links measurements to identified samples and limits. For this requirement, name the correct package drawing and revision in the test brief. A dimensional pass concerns that scope, not memory function or authenticity by itself.
Explore inspection reportsSupport the board already in service.
A targeted component purchase can support your existing EMS or repair team. Keep the released design, service setup and receiving requirements together while sourcing the missing BOM line.
Plan an OEM / EMS shortage purchaseEmbedded storage boards
A shortage buy must retain the controller configuration and production programming algorithm.
Industrial equipment maintenance
Service material needs a reproducible image and bad-block procedure, not just a matching package.
Send the requirement your board needs.
ICstoq reviews our inventory and established China supply relationships against the complete order code, quantity, required arrival date and destination. The quotation confirms the offered lot, inspection scope and delivery terms.
Send your enquiryInclude these details
- MT29F256G08AUCABPB-10ITZ:A and approved revision limits
- Controller, firmware, ECC and bad-block handling policy
- Programming algorithm, erase permission and system acceptance workload
Identify fixed requirements and any alternatives already approved by your engineering team. We agree feasible inspection work and sample acceptance before proceeding.