Skip to content
Independent electronic component distributionChina supply. International business.[email protected]

STM32H743IIK6

An H743 shortage purchase must preserve the released firmware capacity and BGA layout. Confirm the 2 MB device, 0.65 mm pitch package and acceptable silicon revision before comparing lots.

Retain both I fields and the K package.

UFBGA176+25
Flash
2 MB
Body
10 × 10 mm
Grade range
−40 to +85°C
Packing
Tray

Manufacturer ordering reference · availability confirmed by quotation

Decode the code before you compare the offer.

Select a code segment to see its role. Keep the complete manufacturer order code on the quotation, BOM and receiving record.

Selected code fieldH743 Cortex-M7 device subfamily.
Order / recordWhat it meansBefore you accept
II / IGThe second I selects 2 MB Flash; G selects 1 MB.Do not shorten the quotation to H743I or use an IG specification for an II requirement.
K6 / K6TRTray order versus the tape-and-reel packing form.Review carrier acceptance without changing the memory or package requirement.
Revision and operating pointApplication limits can depend on silicon revision and the relevant errata.Have engineering approve the revision and clock/power settings; do not infer these from the family headline speed.

Set the buying conditions for your build.

Choose the situation closest to your requirement. These details help purchasing, engineering and the assembly team review the same offer.

Keep room for the released image.

An HMI or acquisition image built for the 2 MB device may not fit a 1 MB proposal. Retain both I characters when checking supplier descriptions and labels; have engineering approve any memory change.

Include in your enquiry
2 MB requirement, image revision and memory map.

Read identity and handling as separate records.

The product label connects the full order code, lot and quantity. The moisture label records handling conditions. Use this actual STM32H757 example to locate the fields; obtain the offered STM32H743IIK6 pack’s own limits before assembly.

Packaging-handling label

STMicroelectronics
STM32H757 handling-label example

Select a marker on the image or a number below. Each field answers a different purchasing question.

STM32H757 handling-label example · Packaging-handling label · supplied photograph
Select a numbered field to read it.
Packaging-handling label · STM32H757 handling-label example. Supplied photograph.
FIELD 01 / 05

Sensitivity level

MSL 3

This caution label states moisture sensitivity. It does not contain the complete device order code; keep the product label or top mark with it.

For your orderRequest both the identity label and the handling label.

For the MCU you are buying, request its own label limits and opening history. The values in this example are not handling specifications for another STM32 device.

Discuss this requirement ↗

For STM32H743IIK6
2 MB II requirement, K-package footprint and accepted revisions. Production image, external-memory configuration and operating point.

Read more ST labels and markings

Turn the concern into an agreed inspection.

Original identity, unused condition and a correct order code are essential. Programming, handling and application behaviour need their own acceptance conditions.

Package and balls

Record the 10 × 10 mm package, 0.65 mm ball pitch and visible condition against the applicable drawing.

Revision evidence

Agree the permitted identification method and preserve the result with the sampled lot. Review relevant errata with the firmware owner.

Image and memory

Use the production image and memory configuration. Distinguish an MCU programming check from sustained application operation.

Can H743IGK6 be quoted as the same part?

No. The Flash-density field differs. Any 1 MB proposal needs explicit engineering approval.

Is K6TR a separate device page?

This buying requirement also covers discussion of the manufacturer’s reel-packing form. The quotation must retain the complete code actually offered.

Before testing, agree the lot, sample count, method, fixture, limits, report and sample disposition. Electrical and specialised checks depend on laboratory feasibility; they are not implied by a visual inspection.

AD5535BKBCZ dimensional-report example. Its dimensions and results do not apply to this STM32.

Ask for measured results with their reference.

The example connects sample measurements, stated tolerances and photographs. It concerns AD5535BKBCZ, not this STM32. For an incoming dimensional check, name the actual package drawing and revision so the report uses the right limits.

Keep the report connected to the sample, method and agreed limits. Review any exceptions before the lot is released.

Explore inspection report examples

Where an exact-part shortage matters.

Keep your current EMS or assembly partner. A targeted purchase can address the missing BOM line while the approved design and receiving requirements stay under your control.

Coordinate an OEM / EMS shortage buy

Display and HMI controllers

Released graphics assets and firmware can make the 2 MB density a fixed requirement, even when a smaller-memory H743 is easier to find.

Data acquisition equipment

BGA assembly and sustained memory traffic deserve defined acceptance when buying a shortfall for an existing design.

Bring the complete requirement.

ICstoq reviews our inventory and established China supply relationships against your quantity, required arrival date and destination. The quotation confirms the offered lot, packing, inspection and delivery terms.

Send your STM32H743IIK6 enquiry

Useful details for this enquiry

  • 2 MB II requirement, K-package footprint and accepted revisions
  • Production image, external-memory configuration and operating point
  • Tray or approved reel packing, lot splits and delivery schedule

Tell us which conditions are fixed and which need discussion. Any alternative requires your approval before it replaces the requested part.

Image detailFit to view