MTFC32GAZAQDW-AAT
This eMMC appears as a recommended replacement in Micron’s legacy-memory transition notice. Source the exact DW-AAT code and validate the host behaviour; a recommendation is not a drop-in guarantee.
Qualify the managed-memory transition.
- Full device code
- MTFC32GAZAQDW
- Grade field
- AAT
- Manufacturer record
- PCN34603
- Main decision
- Host / firmware qualification
Ordering and acceptance reference · supply confirmed by quotation
Keep every ordering field in the comparison.
Select a code segment, then compare the offered identity with the released BOM. The source references below establish ordering context, not live availability.
| Order / record | What it means | Before you accept |
|---|---|---|
| MTFC32GAZAQDW-AAT | Recommended-replacement column in PCN34603 | The notice names affected old products separately; do not transfer their EOL dates to this replacement. |
| Legacy MLC to 3D TLC | A documented product transition | Validate workload, host behaviour and application acceptance. |
| DW versus HD | Different full codes | Do not approve an HD shipment from a DW enquiry without engineering review. |
Resolve the decision behind the shortage.
Choose the situation that applies to your order. Each one changes what purchasing, engineering and the test owner need to agree.
Start from the exact transition pair.
Match the old BOM code to the relevant row in Micron PCN34603. The notice explicitly stops short of a guaranteed drop-in replacement. Keep the proposed DW-AAT device and required validation in the change request before purchasing production quantities.
Old full code, proposed DW-AAT code and change approval.
Test the real storage workload.
Agree sustained writes, power-loss behaviour and relevant boot/partition configuration for your system. A capacity read or one successful boot is not a substitute for the application workload. State endurance expectations without inventing a guaranteed life from the density.
Host/software, workload and required power-loss behaviour.
Protect irreversible settings.
Define image, boot partitions and verification. Provisioning security keys or permanent protection can make a sample unsuitable for another use. Require explicit instructions before one-time or security-related operations, and identify who owns the keys.
Image version, partition settings and permitted provisioning operations.
Read the fields. Keep the device context.
Explore this Micron documentation example. It belongs to a different memory; use the offered lot’s own label to establish identity and handling requirements.
For MTFC32GAZAQDW-AATThe offered label must show MTFC32GAZAQDW-AAT. A photograph named MTFC32GAZAQHD-IT is a different requirement and is not used as DW stock evidence here.
Manufacturer documentation example
Micron
Standard bar-code label example
Select a marker on the image or a number below. Each field answers a different purchasing question.

Complete part number
The part-number line preserves the full device and revision. Match your offered label to the released BOM; this older memory is only a field-reading example.
Container quantity
This is the labelled container quantity in the manufacturer example. It is not today’s available balance or the quantity committed to your order.
Trace reference
Retain the complete printed trace string with the label and the corresponding receiving record. Do not shorten it when reporting a discrepancy.
Date record
Keep this date field separate from sealing, repacking and inspection dates. Its example value does not describe the material quoted for your order.
Handling conditions
The example prints a moisture classification with temperature conditions. Use the applicable product and lot instructions; do not transfer these limits to another Micron memory.
Machine-readable record
Keep a readable image of the complete label. Micron notes that bar codes can include additional information; a successful scan alone does not authenticate the device.
Send the full label for the actual offered lot.
Discuss this requirement ↗Agree the acceptance brief before testing.
Identity, unused condition and the complete order code are essential. Your device’s programming, assembly and operating requirements still need their own checks.
Device identification
Record full code, readable identification registers where feasible and package evidence; do not equate one register read with authenticity.
Storage function
Use agreed read/write coverage and application tests. Define erase permissions and sample disposition.
Configuration
Record boot/partition and security state only within the agreed scope. No unrequested permanent provisioning.
Does PCN34603 mean this DW part is discontinued?
The cited notice places DW-AAT in its recommended-replacement column. Its old-product EOL schedule must not be applied indiscriminately to the replacement.
Can the local HD shipment photograph prove DW stock?
No. It is a different full order code. An offered DW lot requires its own identity and availability confirmation.
Agree the lot, sample count, method, fixture, limits, report and sample disposition. Electrical or specialised analysis depends on laboratory feasibility; it is not implied by an external visual inspection.
Put the test brief before the sample.
The laboratory workflow starts with the question to be answered. Agree how samples are identified, which operations may change them, and who reviews the findings. The photograph illustrates that workflow, not the status of an offered lot.
Explore inspection reportsSupport the board already in service.
A targeted component purchase can support your existing EMS or repair team. Keep the released design, service setup and receiving requirements together while sourcing the missing BOM line.
Plan an OEM / EMS shortage purchaseAutomotive embedded storage
A controlled memory transition includes host qualification and the required grade documentation.
Embedded system maintenance
Keep firmware, partitioning and recovery requirements with the service material purchase.
Send the requirement your board needs.
ICstoq reviews our inventory and established China supply relationships against the complete order code, quantity, required arrival date and destination. The quotation confirms the offered lot, inspection scope and delivery terms.
Send your enquiryInclude these details
- MTFC32GAZAQDW-AAT; old code and PCN transition row if applicable
- Host/software, workload, boot and partition requirements
- Allowed programming/provisioning operations and application acceptance
Identify fixed requirements and any alternatives already approved by your engineering team. We agree feasible inspection work and sample acceptance before proceeding.